The project is located on the land parcel under the north bridgehead of Huanghuayuan Bridge in Jiangbei District, Chongqing. Based on the slope terrain, the project effectively utilizes the space of the bridge piers to construct a 5-story underground plane movement.
The vertical circulation mechanical parking garage located at No. 131 Taiyang Village, Pingshan District, Shenzhen has been operating well since it was put into use, with the equipment running at full capacity every day.